- China-EU EV tariff talks in Brussels end with 'major differences': Beijing
- Buried Nazi past haunts Athens on liberation anniversary
- Harris to release medical report confirming fitness for presidency: campaign
- Nobel prize a timely reminder, Hiroshima locals say
- China offers $325 bn in fiscal stimulus for ailing economy
- Small Quebec company dominates one part of NHL hockey: jerseys
- Boeing to cut 10% of workforce as it sees big Q3 loss
- Want to film in Paris? No sexism allowed
- US, European markets rise as investors weigh rates, earnings
- In Colombia, children trade plastic waste for school supplies
- JPMorgan Chase profits top estimates, bank sees 'resilient' US economy
- Little progress at key meet ahead of COP29 climate summit
- 'Party atmosphere': Skygazers treated to another aurora show
- Kyrgyzstan opens rare probe into glacier destruction
- European Mediterranean states discuss Middle East, migration
- Thunberg leads pro-Palestinian, climate protest in Milan
- Stock markets diverge before China weekend briefing
- EU questions shopping app Temu over illegal products risk
- Han Kang's books sell out in South Korea after Nobel win
- Shanghai markets sink ahead of briefing on mixed day for Asia
- Investors, analysts eye bigger China stimulus at Saturday briefing
- Musk unveils robotaxi, pledges it 'before 2027'
- At least 11 dead in Florida but Hurricane Milton not as bad as feared
- Asian markets mixed after Wall St drop, Shanghai dips before briefing
- Automaker Stellantis says CEO will retire in 2026
- Musk's promised robotaxi unveil delayed
- On US coast, wind power foes embrace 'Save the Whales' argument
- At least 10 dead in Florida after Hurricane Milton spawns tornadoes
- Internet Archive reels from 'catastrophic' cyberattack, data breach
- Wall Street stocks retreat from records on US inflation data
- Israel strikes central Beirut, killing 22
- Solar storm could impact US hurricane recovery efforts: agency
- Delta eyes Election Day travel pullback as profits climb
- Florida battered by hurricane, floods but spared 'worst-case scenario'
- UK's William and Kate in first joint public engagement since cancer treatment
- Over 200 women in legal talks with Harrods over Fayed abuse claims
- A very stiff breeze: BBC says sorry for 20,000 kph wind forecast
- Musk finally unveiling his long-promised robotaxi
- London's Frieze art fair goes potty for ceramics
- US, Europe stocks fall on US inflation data
- US consumer inflation eases to 2.4% in September
- Hurricane Milton tornadoes kill four in Florida amid rescue efforts
- South Korea's Han Kang wins literature Nobel
- Ikea posts fall in annual sales after lowering prices
- Stock markets diverge, oil gains after China rebounds
- World can't 'waste time' trading climate change blame: COP29 hosts
- South Korean same-sex couples make push for marriage equality
- Mumbai declares day of mourning for Indian industrialist Ratan Tata
- 7-Eleven owner restructures to fight takeover
- Sri Lanka recovering faster than expected: World Bank
Dismantling Germany's Lubmin nuclear plant, piece by piece
At a former nuclear power plant near Lubmin on Germany's Baltic coast, workers in the disassembly hall are chopping up a bulky grey section of a pump from inside one of the reactors.
A bandsaw slowly eats its way through the part, cutting it into smaller chunks that will fit in the decontamination units.
Those pieces will be blasted with iron sand, removing a dangerous top layer of material to be packed up and stored away from harm.
In mid-April, Germany's last three nuclear plants will go offline. But as their working life comes to an end, the painstaking task of decommissioning and dismantling the units begins.
The facility near Lubmin, built by East Germany's communist government and also known as the Greifswald nuclear power plant, was closed in 1990 with reunification.
But it will still be several decades before the work here is done.
"These nuclear power plants were built to last forever," said Hartmut Schindel from site manager EWN, so taking the plant apart has been a learning process.
"No one was responsible for the decommissioning in the 1960s" when the plant was first designed, Schindel said.
- 'Massive amount' -
In all, workers at the plant have 1.8 million tonnes of material to sort through and shift.
"It's a massive amount," said Schindel, who first joined the plant in the former East Germany in 1976 and was later responsible for the disposal of nuclear waste.
The vast majority of the volume will be released for reuse after a lengthy administrative process, but a small percentage of contaminated material must be sequestered.
Access to the disassembly area is closely controlled. Workers strip off their clothes, put on standard-issue underwear and a bright orange jumpsuit before they can enter the hall.
Exposure to radiation inside is counted by a personal meter carried in a breast pocket.
Coming out, a cubicle that speaks with a woman's voice checks for contamination, counting down from 20, asking the individual to turn around and starting the timer again before opening the exit.
Among the last items to be disposed are large components from the centre of the reactors, stored in a vast hangar on site.
Six pressure vessels and 21 steam generators lacquered in bright colours are waiting here to be chopped up.
For these, EWN is erecting a completely new disassembly hall, set to be completed in 2025.
The unit, where the most radioactive parts from the core will be sawed up under water for safety reasons, is an experimental project that could serve as a model for other decommissioning efforts, said EWN spokesman Kurt Radloff.
Meanwhile the work at the plant is set to continue into the 2060s, a good 70 years after it closed, with a total cost in the "high single-digit" billions of euros, Radloff said.
- 'More complex' -
The process of dismantling the communist nuclear plants was "more complex", not least because information was "lost" during reunification, said Christian von Hirschhausen of the think tank DIW.
But even dismantling some of the western plants could still take 30 or 40 years, von Hirschhausen said.
What is more, it was already "foreseeable" that some 23 billion euros ($25 billion) set aside for decommissioning would not be enough, he said.
"The question is then, who will pay for the additional costs?"
In all, Germany will have 29 closed reactors to decommission once the final three plants go offline.
The country's last nuclear power plants were kept running longer than planned amid fears of an energy crisis sparked by Russia's curtailing of gas exports during the Ukraine war.
But the end of nuclear is a settled debate in Germany, where atomic energy has long been a sensitive issue.
While other countries are planning new projects, the idea of a nuclear revival in Germany does not appeal to Schindel, who will retire before the works at the plant are done.
"The future does not point towards nuclear energy but other forms of energy," he said.
Ng.A.Adebayo--CPN